Prepare Surface
- Apply 2 layers of weather resistive barrier to the sheathing surface.
- Apply metal lath over the weather resistive barrier.
- Apply ½" scratch coat of type N or S mortar or pre-mix mortar specified for stone veneer use over metal lath.
- Allow scratch coat to dry for 24-48 hours.
|
|
| |
|
Install Stone
- Install corners first, then flats.
- Gently wet the scratch coat and stone veneer.
- Apply approximately ½" thick mortar
to back of stone.
- Place stone onto scratch coat.
- Gently wiggle piece into place.
- Do not smear or wipe mortar onto the face of the stone
- Do not remove any excess mortar on the face of the stone when mortar is wet. Allow it to dry and use a soft bristle brush to remove.
- Do not use acid wash or bleach
based cleaners on StoneCraft.
|
|
| |
|
Apply Grout
- Grout as needed using a type N or S mortar mix.
- Use grout bag and fill areas where scratch coat may be exposed.
- Strike joints after grout is thumbprint dry.
- Whisk away loose mortar.
|
|
| |
|